Sunday, February 14, 2016

siding , electrical and plumbing

slowly working on juniper board and batten siding.   On not too rainy days we go up and add more siding, here are some photos of the window dressing on the cupalos on the north side of the house.   On rainy days we work on the plumbing , including placing the shower and tub/shower and the drain pipe under the house and the supply water to all the plumbing fixtures.    lately we have been pulling wire for the electrical and have most the wire pulled for the house, next we will pull  the computer wiring  for ethernet access .  you can see the main feed cable coming thru the trusses it is the large gray cable , this cable runs from the mech. room where the power comes into the house to the loft where the house subpanel is located we still have generator feed to pull in . the photo of the chimney show the cap we had made to help keep the water from coming into the house.  the concrete stone we used on the outside of the chimney  is absorbing water and causing it to leak inside the house , next summer we will coat the stone outside with a waterproofing agent.












No comments:

Post a Comment