Monday, September 3, 2018

leaded glass window and final coat of stucco

  Started working on those four leaded glass windows last christmas. They are now assembled and installed.  They let light into our bathrooms from the laundry room.   Have never made anything like this, took lots of time and patience to get everything to fit.  Trust me each window has its own mistakes that i can see but sometime its just close enough.    With a great amount of help we finished up the stucco before the rain starts.So,  now two coats of sealer and the window trim can go on. We are hoping to get concrete poured before the fall steady rains start and I will be very happy.    We just ordered the window treatments which will be roller blinds with a chain drive lift .  They will be mounted in a box tucked in the top inside of the window sill.